Platform 1 & 2 included fire rated timber cladding to the lift shaft and lift motor room, including louvers and fire rated doors, new timber columns supporting the platform canopy were installed to replace the existing defective columns. The existing cast gallows brackets supporting the canopy were removed, these then underwent the following renovation works:
All castings were shot blasted and inspected – the existing castings were used as a pattern to cast replacements, where these could not be repaired. Repairs carried out included welding repairs for broken units and Heat treatment. The units were then returned to site, reinstalled and decorated to match the existing finishes.
The platform canopy also received new timber corbels to support the cast gallows brackets, new dagger boards and timber end panel, all decorated to match the existing station colours.
The final part of the works included louvered walls installed around the DNO room and Electrical intake room to the Southern side of the station.